Service101

Workshop operations

Building a service schedule your workshop can actually hit

· 4 min read

Every service department has had the day where eight cars are booked in, six of them need a ramp, and two of them are waiting on a part that will not arrive until tomorrow. Nobody made a mistake. The diary simply had eight empty slots and no opinion about whether the workshop could do the work.

A diary is not a plan

A calendar records intent. It does not know how many technicians are on shift, who is qualified for a diagnostic job, which ramp is occupied by a vehicle waiting on a warranty decision, or whether the parts for tomorrow morning have actually landed. Booked and achievable are two different things, and only one of them is visible in a plain diary.

Schedule against capacity

The scheduler in Service101 sits next to the repair orders rather than beside them. Bookings are made against the people and time you actually have, so a full day looks full before the customer is promised a four o’clock collection. When a job overruns, and jobs do overrun, the knock-on is visible while there is still time to phone someone, rather than at half past four.

Keep the customer in the loop from the same place

Because the schedule, the repair order and the customer conversation live in one platform, telling someone their car will be ready tomorrow is not a separate task in a separate tool. The follow-up is attached to the job, so it does not depend on the advisor who took the booking still being on shift.

The measure that matters

The point of scheduling well is not a tidy diary. It is fewer vehicles carried over to the next day, fewer collection times missed, and fewer customers phoning to ask a question the workshop already knows the answer to.

Keep reading